If you would like to work on this G9 Investigation Template as your starting point to your Investigation for Project 1, please follow these steps:
- Save a copy (File, Make a copy)
- Click OK to Copy Document
- Click on the name of the document (top left): Copy of ......
- Enter a new document name
- Change the Sharing settings for your group to be able to work collaboratively (use the Share button at top right of your screen)
You can watch a step by step video tutorial in my YouTube Channel!
Continuing on Project 1, please continue your research on two Famous Bridges focusing on:
- materials
- reason
- benefits
- drawbacks
- design/type
- diferent locations
For your Project 1 problem: Design, build and test an aesthetically
pleasing, yet economical bridge to replace the Clifton Suspension Bridge. How will you solve this challenge?
Basic Design Specifications
Materials: Regular Spaghetti and glue gun glue
Cost: £1 per strand of spaghetti, £.50 per glue stick
Scale: 70cm minimum
No support except the top of the desk.
- How will the bridge be tested? A bag will be suspended from the center of the bridge and weight will added until it collapses
- How will the bridge be judged? Strength, Cost, Design
Visit the G9 Due Dates webpage to plan for your assignments.
Remember to make your Process Journal entry of the day. You can use this Process Journal shared Doc template.
No comments:
Post a Comment